Git OSS-um

Semester One Schedule

Semester one schedule

Above is a basic Gantt chart of the first semester schedule. As briefly stated, the first semester was scheduled to acquire requirements from our sponsor. As the semester move forward, we eventually begin to design our software based on the requirements acquired. When we designed our software, we would describe our technologies we would use, and implement the technologies into a functioning prototype. The gathered frameworks during this time would be changed at the beginning of the second semester. Overall, the first semester outlined our requirements, layed out the initial design and technologies of our product, and ended with a functional prototype that highlights our requirements, design and proof of concept.