Problem Overview

In order to gather these requirements, we have been holding weekly meetings with Dr. Leverington. During these meetings we discuss what he is looking for in the final product, and brainstorm potential requirements with him. This has come as a huge help as it has allowed us to gain a feel for which areas we should be focusing on throughout the project. We have also been doing plenty of research in our own time and reporting back to Dr. Leverington during these meetings. Along with this, we have also met with the electrical engineering team who is working on R.A.T. concurrently to ensure that the work we are doing is compatible with theirs.

Our four main functional requirements that we have identified through our acquisition process are as follows:

The above only represents four of our highest level functional requirements for the project. In order to accurately defined these requirements, they can be broken down into many different sub-requirements. To view a detailed outline of all functional requirements, please refer to our Requirements Specification document.

In order to better define how we seek to achieve these requirements, we have outlined the following performance requirements:

Some of the environmental constraints we have identified in the project include:

If you are seeking more detail in either our requirements or acquisition process, please refer to our Requirements Specificationdocument.