MEETING MINUTES

 

Topic:  Project Requirements

Wednesday, October 25, 2017

1:00 pm – 4:00pm

 

Minutes recorded by: Mohammad Almutairi

Attendees: Mohammad Almutairi, Kevin LoGrande, Saleh Aldhufairi, Trevor Cotter

Please bring: Notebooks, laptops

 

Executive Summary:

We met Trevor in Wettaw Building room 209 and discussed the results of our analytical analysis. Also, Trevor talked to the team about an analysis software called Imagescope. He provides us some SEM pictures to evaluate in order to learn how the app works. He also assigned a machining task to Kevin. The entire team will research the statistics involved in method validation. After the discussion, we went to collect some data about back pressure vs filter configuration from the current flow loop.

 

Table 1.  Record of meeting.

1:00pm to 2:00pm

Discussion about Project

  • Discussion about the results of the individual analyses
  • Discussion regarding the potential design of a DLS System
    • DLS requires particles close in size to wavelength of light used
  • Brainstorming ways in which to incorporate the fluoroscope into the design
    • Trevor to send details about the fluoroscope
  • Discussion of further organizing our efforts
    • We will email at the beginning of each week with scheduling

Wettaw Building RM 209

2:00pm to 4:00pm

Data Collection

Physical Sciences Building

 

Table 2.  Action Items

Task

Person Assigned

Due Date

Date Complete

SEM Image Analysis

Individual

11/1/2017

Statistics Research

Team

ongoing

Machining Parts

Kevin

11/8/2017